CureZone   Log On   Join


Email this message to a friend Email This Message to a Friend!


@ Friend's Email Address:  

Message URL: http://www.curezone.org/blogs/fm.asp?i=1614309

Engineering Math?
(My Quest for the Truth of Life, by Kerminator!)

Engineering Math? by kerminator .....

We all get an opportunity to see how thing work or the result...

Date:   4/29/2010 10:44:11 AM ( 14 y ago)

 

  Enjoy this math problem I did!

 

Engineering Math Question 

 

 

Conditions:
A trackhoe weighing 22 tons is on top of a lowboy trailer
and heading east on Interstate 70 near Hays, Kansas .
The extended shovel arm is made of hardened refined
steel and the approaching overpass is made of
commercial-grade concrete, reinforced with 1½ inch
steel rebar spaced at 6 inch intervals in a criss-cross
pattern layered at 1 foot vertical spacing.  
 
 
 
Solve: 

 


When the shovel arm hits the overpass, how fast
do you have to be going to slice the bridge in half ?
(Assume no effect for headwind and no braking by the driver...)  
  

 


 
Extra Credit: 

 


Solve for the time and distance
required for the entire rig to come to a complete stop
after hitting the overpass at the speed calculated above.
Yes, you can neglect friction.

 

( Sorry the pics did not transfer...  maybe next time! )   I\They showed a bridge almost cut in half by the raiased arm of the Back Hoe tractor! 

I couldn't solve it either......but who cares.  The pictures are great!
The driver was on his cell phone.
 

 


 

Popularity:   message viewed 1936 times
URL:   http://www.curezone.org/blogs/fm.asp?i=1614309

<< Return to the standard message view




 


 

Donate to CureZone

0.0469 sec
IP 3.137.178.122