6’ cleanout on the lowest leach line.
![6’ cleanout on the lowest leach line. 6’ cleanout on the lowest leach line.](https://www.curezone.org/upload/_S_Forums/Septic/140607_0006.jpg)
This was where I had intended to put a small circulation pump to help insure the effluent made contact with the bubblers, but it and the line above it are dry now. I had extended this one about 18" below the leach line. You can see the round hole I dug. It's filled with drain rock up to 2"s above the leach line, and compacted dirt up to the bottom of the cleanout cover box.
URL:
Thumbnail:
To embed this file into your forum/blog entry, highlight the URL, right-click and copy it, and then paste it into the body of your forum or your blog message, while in text mode (plain text
editor).
If posting a message by using a HTML editor (FCK or MCE), you will have to use the appropriate buttons (Insert Image) from the editor toolbar. HTML editors have buttons for inserting hyperlinks, images and other HTML objects.
If posting a message by using a HTML editor (FCK or MCE), you will have to use the appropriate buttons (Insert Image) from the editor toolbar. HTML editors have buttons for inserting hyperlinks, images and other HTML objects.
6’ cleanout on the lowest leach line.
Uploaded by sewerrat